How Much Does It Cost To Get A Building Permit In Ghana

A Building Permit allows construction of buildings or structure to proceed on condition of compliance to building code.

How Much Does It Cost To Get A Building Permit In Ghana

It must also be noted that Development/Building Permit Fees are different from Development Application Processing Fees. 84.00 + 30% of 66 per gross floor area of 5,000 sq. ft. 84.00 + 30% of 66 per gross floor area of 5,000 sq.

How do I get a building permit in Ghana?

Attach completed land ownership document from Lands Commission.

Attach three/four copies of architectural drawings signed by a certified Architect.

Attach four copies of structural drawings signed by an Engineer.

The proposed development must conform to zoning status.

What is the use of a building permit?

A building permit essentially secures the safety, uniformity in design, and compliance with the law of a certain construction.

It will only be issued once all the legal requirements and local regulations are met. It ensures that certain standards are complied with even before putting the building plan into action.

What are the requirements of a residential building?

Strength and stability.

Dimensional stability.

Resistance to dampness.

Resistance to fire.

Heat insulation.

Sound insulation.

Protection against termite attack.

Durability.

What are local building codes?

A building code is a set of regulations, or ordinances, enacted by state or local governments to ensure that buildings meet minimum health and safety standards in areas such as foundation, roofing, drainage, structural support, plumbing, electrical, ventilation, heating and air.